Navitas

Conserving Resources. Renewing Facilities.

  • Home
  • Who We Help
    • K-12 Schools
    • Higher Education
    • Government
    • Commercial Properties
    • Heathcare
    • Infrastructure
  • How We Help
    • Our Approach
    • Solution Development
    • Collaborative Project Delivery
    • Engineer-Procure-Construct
    • Energy Savings Performance Contract
    • Data Analytics
    • Energy Management
    • Verification
  • Why Navitas
    • About Navitas
    • What Makes Us Different?
    • Proven Savings
    • Qualifications
  • Case Studies
  • Learning Center
    • Articles
    • Videos
  • News
  • Contact
    • Contact Us
    • Career Opportunities
  • Home
  • Who We Help
    • K-12 Schools
    • Higher Education
    • Government
    • Commercial Properties
    • Heathcare
    • Infrastructure
  • How We Help
    • Our Approach
    • Solution Development
    • Collaborative Project Delivery
    • Engineer-Procure-Construct
    • Energy Savings Performance Contract
    • Data Analytics
    • Energy Management
    • Verification
  • Why Navitas
    • About Navitas
    • What Makes Us Different?
    • Proven Savings
    • Qualifications
  • Case Studies
  • Learning Center
    • Articles
    • Videos
  • News
  • Contact
    • Contact Us
    • Career Opportunities
Orrick High School

Case Study

Orrick R-XI School District

$1814624

Estimated savings over 15 years
in 1 building totaling 81,132 square feet.

Utility Savings

23%

Improvement Measures

Heating & Cooling
  • VRF system installation, Rooftop unit replacement
Other
  • Programmable thermostats

The Opportunity

Orrick is a small community just outside of Kansas City, Missouri. In May of 2014 a tornado destroyed part of their high school building, including parts of the heating and cooling system throughout the district. Before the tornado, the district needed to address aging heating and cooling systems as well as bring ventilation codes up to current standards. The plan was to evaluate different options, design a new system, and procure funding within a year and complete the project in the summer of 2015. The tornado accelerated those plans to accommodate students by the fall semester of 2014.

Technical Solution

With an original building built in 1923, along with several additions built over the years, the Orrick School building was a collection of different heating, cooling, and ventilation systems. Part of our task was to determine the best system that would work throughout the facility in each different space. Additionally, we needed to add ventilation in order to meet current building codes. We determined a VRF (variable refrigerant flow) system would be best for this building, which would allow the district to get away from costly fuel oil and propane heating costs.

Financial Solution

Navitas quantified the savings from changing the heating and cooling system. Savings, along with bond issue and insurance monies, provided funding for a $1.6 million project that helped to modernize their educational space.

Download a PDF of this Case Study


Platte County High School

Next Case Study

Platte County R-III School District

Read a Little More