Navitas would like to thank our subcontractors on the Lockwood School District Energy Performance Contract, Gold Mechanical, C&C Group, BioStar Lighting, and Navitas Construction Manager, Richard, for their well-coordinated and highly efficient efforts to meet a very aggressive schedule.
Our team spent the two weeks over winter break upgrading all of the rooftop HVAC for Lockwood HS and nearly all the HVAC system at Lockwood ES. A Building Automation System (BAS) was also installed during this period to provide the owner remote global access and greater control over their HVAC systems.
Data analytics hardware and software were deployed and once implemented will allow Navitas to assist Lockwood School District in optimizing their building systems to capitalize on energy savings potential.
BioStar Lighting completed retrofitting all interior lighting from fluorescent to LED lighting at both schools during the break. At the HS, Biostar installed all new gym lighting controlled by motion sensors to maximize energy savings.
We are proud to help our client and get this work done without disrupting their education mission so teachers and students come back after break to a more energy efficient, brighter and warmer buildings.